CE Marking

All machinery and pressure vessels must be supplied with a technical construction file and in most cases CE-marking is required. During the entire design process all risk must be minimized as a safe design is the first step to a safe installation.

All installations require a Risk Assessment. This forms the basis of the technical construction file. All risks are hereby identified and weighed. For unavoidable risks proposals will be assembled in an action plan. Risk Assessments apply to both existing and new installations or plants.

visual
Sustaining Results Through Engineering