Nut Shell Filter

Closing Spools A-18 Petrogas

Design specifications

Client :

Project :

Goal:

Petrogas E&P NL

A18 Gas platform

3D scan survey and design of closing spool

Project Closing Spool

For the closing spool to connect the new wells to the facility plant, a last closure pipe spool needed to be measured, designed, fabricated and installed within the shortest period possible. To do so, our engineer was on stand-by and after installation of the X-mas tree he performed a 3D scan of the connection flanges. After the scan he designed the closing spool on location, which was sent to the office for check. After approval the fabrication drawings were handed over to the pipe-fabricator with close measuring checks by our engineer.

Result

With this method it was possible to go from measuring to installation within a week and first time right.

   

 

visual