Repair of Cocoa Roaster Drum

Design specifications

Client :
Project:
Object:

TATA steel
Walkway to demount goggle valves
Design a new walkway to access the goggle valves in a safe manner

Problem definition

In the existing situation the goggle valves are not easily accessible. To disassemble all bolts in the goggle valves the pipeline must be climbed on. This results in dangerous situations.

Contribution of Stemar Engineering

Designed a new walkway with which the goggle valves are easily accessible.

Result

A walkway with which all goggle valves are easily accessible. The other side of the pipeline is easily accessible by means of a bridge. The design of the walkway resulted in a safe working environment.

visual