Design Parameters
Client:
| GDF SUEZ | | Object: | OAS Clamp for the L10-L en K12-D
| | Vertical load: | 102 kN (10t)
| | Horizontal load: | 78 kN (8t)
| Problem definitionFor the connection between the OAS system and an offshore platform a clamp with docking pin is required. After hooking up people can walk from the boat to the platform. Contribution Stemar EngineeringDesign of the OAS Clamp, which is lighter and easier to mount. Of course stress calculations for the hooking up and wave loading. Finite Elemant Modeling was used for the clamp and steel structure calculations for the structure and stairs.
ResultA safe Clamp which is also lighter than previous ones. Also the engineering of stairs and platforms was incorporate in the designs.
|